中文 | English
HENAN CHANGZHENG ELECTRIC CO., LTD
HENAN CHANGZHENG ELECTRIC CO., LTD
  • Home
  • About Us
    • Company profile
    • Chairman's speech
    • Corporate culture
    • Staff style
    • Management team
    • Organizational structure
    • Party and government trade union
  • Product center
    • Product display
    • Product Application
  • Typical Case
  • Dynamic information
    • Company dynamics
    • Media report
    • Industry information
  • Qualification Honor
    • Company qualification
    • Patent Certificate
    • Test Report
  • Technical Support
    • Technical service
    • Tooling equipment
  • Human Resources
    • talent strategy
    • Recruitment Information
  • Contact Us
Location >
  1. Home
  2. Dynamic information
  • The first batch of units of Baihetan Hydropower Station was officially put into operation
    On June 28, the first batch of units of Baihetan Hydropower Station on the Jinsha River, the largest...
  • State grid and Southern network second interconnection channel Minyue networking project started
    On April 23, the Minyue networking project started. With an investment of 3.2 billion yuan and a tra...
  • The first transformer centralized control station based on the new generation of equipment monitoring system and digital twin technology was built in China
    On April 22, China's first transformer centralized control station based on a new generation of equi...
  • The difference and selection of frame circuit breaker and moulded case circuit breaker
    If the rated current, breaking capacity, and protection are met, can the plastic shell replace the f...
  • The China Electricity Union forecasts that electricity consumption in the whole society will grow by 6-7% in 2021
    Recently, at the press conference of the "2020-2021 National Power supply and demand Situation Analy...
  • Kunliulong UHV multi-terminal flexible DC demonstration project put into operation
    On December 27, Wudongde Power Station, the national key project of west-east power transmission inv...
  • "14th Five-Year Plan" will be planned to build seven UHV DC lines
    On March 1, the State Grid Corporation issued the company's "carbon peak, carbon neutral action Plan...
  • The first DC distribution network demonstration project will be completed and put into operation before the end of June next year
    Recently, the "Medium and Low voltage DC Power Distribution System Key Technology and Application De...
  • The high proportion of new energy connected to the national interconnection grid will continue to strengthen
    As China makes a "carbon peak, carbon neutral" commitment, and requires that by 2030 China's total i...
  • The first set of integrated storage and charging device in China is connected to the grid in Hunan Province
    The 100 kW /270 KWH platform area storage and charging integration device independently developed by...
  • State Grid Ali and Tibetan-China grid interconnection project put into operation
    State Grid Co., LTD. Ali and Tibetan-Central power grid networking project (referred to as "Ali netw...
  • Voltage kV Why is k lowercase?
    International standard units of measurement are generally in lower case. Only units with named names...

Contact Us

  • HENAN CHANGZHENG ELECTRIC CO., LTD
  • The Contacts:Changzheng Electric
  • Mobile Mobilephone:0086-13523286357
  • The Telephone:0086-374-5118908
  • E-Mail:2115809239@qq.com
  • WebSite:www.hnczdq.com
  • Address:Intersection of Hanfeng Road and Shangji Street, Jian'an District, Xuchang City, Henan Province
  • WeChat Talking
    1904337586294362112 提交留言
    HENAN CHANGZHENG ELECTRIC CO., LTD 豫ICP备11016643号-1 

    豫公网安备 41102302000339号

     Technical support:yong cheng network
    Home
    Product
    Consulting
    Call
    Navigation